Abu Dhabi’s largest developer Aldar reported its nine-month results on 27 October 2026: net profit after tax rose 19% year on year to AED 7.1 billion and earnings per share grew 20% to AED 0.77. After a measured first half, Aldar accelerated launches, introducing seven projects in the third quarter and 12 year to date.
- 9M net profit of AED 7.1 billion (+19%); EPS of AED 0.77 (+20%).
- Group development sales of AED 18.9 billion, including AED 6.8 billion in Q3.
- 7 launches in Q3 and 12 year to date; group liquidity of AED 38.2 billion.
Marsa Al Saadiyat and other drivers
In July Aldar unveiled Marsa Al Saadiyat, the final phase of Saadiyat Island’s masterplan with an AED 100 billion GDV, of which Aldar will develop AED 60 billion, with launches starting in the second half. In Q3 Aldar and Mubadala acquired the near-fully occupied Masdar City Square for AED 918 million, and UK-based London Square lifted nine-month sales to AED 1.4 billion (+177%).

